Every reviewer must leave one concrete improvement with each review. A small rule that turned a review loop into a continuous-improvement loop.

Key Architectural Takeaways
- Each reviewer, from every vendor, must attach exactly one concrete improvement alongside its verdict.
- One reviewer's prompt silently omitted it, because its built-in review command would not accept a custom prompt; we found and closed that gap.
- Suggestions are ranked, de-duplicated and turned into tracked work rather than left in comment threads.
The rule
With each lap of the round robin, the reviewing agent has to find one improvement: something concrete in the code, the tests, the process or the tooling, in addition to its approve-or-request-changes verdict. It sits under its own heading, so it can be extracted automatically.
Why it works
A pass or fail verdict only says whether this change is acceptable. A required improvement asks a second question: what would make the next change better? Across many laps, those answers add up to real changes in the pipeline itself.
The gap we found
When we audited the loop, one vendor's agent wasn't producing suggestions at all. Its built-in review command doesn't accept a custom prompt alongside a base branch, and the second call used to extract the verdict was hard-wired to answer with a single line. So the improvement section never appeared. The fix rewrote that second call to require the improvement heading and then the verdict, with a test that checks the generated prompt, and updated the documentation to say all five reviewer paths now enforce it.
Where the suggestions go
Suggestions flow into a ranked backlog. Another agent endorses or dismisses each one, duplicates are clustered, and the survivors become tracked tasks that an authoring agent picks up. Later posts cover how that backlog was triaged and how the work stays lean on tokens.
Takeaway
If you want a process to keep improving, make improvement a required output of every cycle, and then audit that it is really being produced.