A Human-Gated Queue: Skip, Park, Keep Moving
When a task needs a person, the pipeline now parks it in a separate non-urgent list and carries on, so one waiting decision no longer freezes everything behind it.

Key Architectural Takeaways
- Items that need a person move to a dedicated, non-urgent Human-Gated tab and stop blocking the rest of the task list.
- The urgent rail is kept for genuinely time-critical gates, so it stays meaningful.
- Each parked item records exactly what is needed, so clearing it later takes minutes, not archaeology.
The problem with a single waiting list
Our development dashboard tracks a long task list worked by several agents. Some tasks need a person: a payment, a social post, a physical step. When the pipeline stopped at each of those and waited, the human became the bottleneck and progress on everything else stalled with them.
Skip, park, keep moving
We added a Human-Gated Items tab and a dedicated wait state for non-urgent human gates. The rule for an agent is simple: if the next step needs a person and isn't time-critical, record exactly what is needed, park the task there, skip it, and continue with the next task. The pipeline then completes more of the list in the same run, and a person clears the parked items when they get to them.
Two lists, two meanings
The urgent rail stays for gates that are genuinely time-sensitive. If everything is urgent, nothing is, so non-urgent items were given their own place instead of crowding the urgent view.
Handoffs that don't stall
A related fix covered the review handoff itself. Pull requests authored by some of our agents were not being recognized by the review coordinator, so they were skipped without a primary review. The coordinator now classifies every agent's branch prefix and dispatches the right reviewers, with a rule that no agent reviews its own work.
The takeaway
The goal was never to remove people. It was to stop a single waiting decision from holding up everything else, and to make the waiting items visible in one honest place.